39 Performance Revi ew Sect ion 02 Annual Report 2022 MANAGEMENT DI SCUSS ION & ANALYS I S Wtp Million Litres Daily (“MLD”) Location Project Value (RM’Million) Progress of Works Sultan Iskandar 2 WTP (Phase One) 160 Johor Bahru, Johor 166.5 85.15% Sultan Iskandar 2 WTP (Phase Two) 160 Johor Bahru, Johor Expected to be tendered in Q2 FY2023 Awaiting Phase 1 completion Air Panas C WTP 15 Segamat, Johor 26.98 85.2% The RM165.5 million 160 MLD Sultan Iskandar 2 WTP has achieved close to 81.26% completion and is expected to achieve its commercial operation date (“COD”) by December 2023. The second phase of the 160 MLD, which is expected to be completed by FY2025, will double water treatment capacity to 320 MLD. At the RM26.9 million, 15 MLD Air Panas C WTP, upgrading works are nearing completion with up to 82.0% of physical progress achieved. Once completed in August 2023, Air Panas C will see its water treatment capacity increase from 11.5 MLD to 26.5 MLD – effectively meeting increasing water consumption demand from the areas of Pekan Tenang, Felda Moakil, Pekan Bekok, Pancha Jaya, Pekan Chaah, Sg. Berlian and surrounding areas. Also in progress are works under Ministry of Natural Resources, Environment and Climate Change (“NRECC”) for the Ulu Sedili Besar raw water transfer project. Completion of this projects, expected in August 2023, will enable 260 MLD of raw water to be transferred from Sg Ulu Sedili Besar to the Seluyut dam. International Operations THAILAND Ranhill Water Technologies (Thai) Ltd. (“RWTT”) and AnuRAK operate 9 water, wastewater and reclaimed water treatment plant facilities at the Amata Industrial Estate (“Amata”) in Amata City, Chonburi and Rayong, Thailand. The total capacity of these plants is 117 MLD, 100 MLD is for water and wastewater and 17 MLD is for reclaimed water. No Description Company Capacity (MLD) Concession Type Expiration of Concession / License 1 Amata City Chonburi Industrial Estate WTP2-CB Stage 2, 10.5 MLD AnuRAK 10.5 Potable Water / BOT 2028 2 Amata City Chonburi Industrial Estate WWTP1-CB, 24 MLD AnuRAK 24 Wastewater / BOT 2028 3 Amata City Chonburi Industrial Estate WRTP1-CB, 10 MLD AnuRAK 10 Reclaim Water / BOT 2033 4 Amata City Rayong Industrial Estate WTP1/2-RY, 15 MLD AnuRAK 15 Potable Water / BOT 2032 5 Amata City Rayong Concession (Industrial Estate) WWTP4-RY, 20 MLD AnuRAK 20 Wastewater / BOT 2043 6 Amata City Rayong Concession Industrial Estate WRTP2-RY, 7 MLD AnuRAK 7 Reclaim Water / BOT 2039 7 Amata City Rayong Industrial Estate WTP2-RY, 10.5 MLD RWTT 10.5 Potable Water / ROT 2039 8 Amata City Rayong Industrial Estate WWTP2-RY, 9.6 MLD RWTT 9.6 Wastewater / ROT 2039 9 Amata City Chonburi Industrial Estate WTP2-CB Stage 1, 10.5 MLD RWTT 10.5 Potable Water / ROT 2041 As the effects of the COVID-19 pandemic continued to wane in FY2022, there were increased operational activities across all industrial parks. The increased activities consequently led to larger volume of wastewater treated, which translated into stronger revenue flows for RWTT and Anurak year-on-year.
RkJQdWJsaXNoZXIy ODQxNzg=