Ranhill Utilities Berhad - AR2022

49 Performance Revi ew Sect ion 02 Annual Report 2022 MANAGEMENT DI SCUSS ION & ANALYS I S RANHILL WATER TECHNOLOGIES (“RWT”) In FY2022, Ranhill Water Technologies Sdn Bhd (“RWT”) posted a topline performance of RM20.0 million, a 62.6% improvement year-on-year. RWT in FY2022 has successfully replenished its order book to the tune of RM41 million during the financial year. The RWT was successful in securing contracts with a total cumulative value of RM41 million. The completion of several projects also contributed to higher revenue recognition in FY2022. No Project Description Client Contract Value (RM'Million) Timeline 1 Supply of equipment for sequential batch reactor and chemical dosing on 10th Feb 2022 by AnuRAK Co Ltd for Upgrading work Amata City Rayong WWTP P4 AnuRAK Co Ltd THB 15.9 million *MYR: 2.0 Start: 10 Feb 2022 End: 10 Aug 2022 EOT: 31 Oct 2022 2 Kerja-Kerja Horizontal Directional Drilling (HDD) 11kV (Interim) Bagi Negeri Perlis, Kedah & Perak, SBU Asset Development, Distribution Network, TNB Ibrahim & Sons Engineering Sdn Bhd 7.3 Start: 15 May 2022 End: 15 May 2023 3 Contract to Supply, Deliver, Install Including Testing and Commissioning for Upgrading of Industrial Effluent Treatment Plant at MSM Sugar Refinery ( Johor) Sdn Bhd, Tanjung Langsat, Johor MSM Sugar Refinery ( Johor) Sdn Bhd 6.1 Start: 8 Jun 2022 End: 30 Jun 2023 4 Kerja-Kerja Pembinaan Sistem Rawatan Tangki Air (Tangki Enapan) serta Kerja- Kerja Berkaitan dengannya di Loji Rawatan Jeneri, Kedah Darul Aman HHF Trading/ Syarikat Air Darul Aman (SADA) 2.9 Start: 21 Jun 2022 End: 30 Jun 2023 5 Proposed Rehabilitation Of Sembrong Barat Water Treatment Plant, Kluang, Johor For Package 1: Design, Construction, Testing And Commissioning Of Microstrainer System And Associated Works Ranhill SAJ 9.8 Start: 15 Oct 2022 End: 14 Jul 2023 6 Proposed Design, Construction, Testing And Commissioning For Extension Of Additional 4 MLD Package Plant At Loji Rawatan Air Lok Heng, Kota Tinggi, Johor Ranhill SAJ 11.9 Start: 1st Nov 2022 End: 30 Apr 2023 Note * : Average rate (RM vs THB) for project In terms of completed projects, RWT completed several projects in FY2022 such as: No Project Description 1 Refurbishment works consisting of supply, deliver & install sparepart for rvc-30 swivel joint daf system at Endau wtp, Mersing 2 Kerja-kerja pembaikan “High Pressure Inlet Pipe” di lra Endau Mersing 3 Sewerage works approval for obtaining letter of completion for Senai-Desaru Expressway 4 Design and build contractor to convert Sewerage Treatment Plant (stp) to Small Sewerage Treatment System (ssts) at Penawar toll plaza complete with obtaining of the letter of completion from Jabatan Perkhidmatan Pembentungan ( jpp) for Penawar Toll Plaza, Senai-Desaru Expressway (E22) 5 Supply Of Equipment For Equalization Tank, Sequencing Batch Reactors (SBR) And Chemical Dosing For Upgrading Works For Amata City Rayong Wastewater Treatment Plant Phase 4 (WWTP-04) Securing contracts with a sum value of RM41 million Design and construct the 2 MLD Desalination WTP ISO 9001:2015 (Quality Management System)

RkJQdWJsaXNoZXIy ODQxNzg=