50 Performance Revi ew 02 Sect ion Ranhi ll Ut i l i t i es Berhad The financial year saw RWT secure the retender for the 2 MLD desalination WTP in Forest City, Johor. This is Malaysia's first large scale desalination plant operated by water supply operator. The retendering is due to the project initially being called off by the project owner in FY2021. RWT’s scope of works for the RM9.55 million desalination plant comprises design, construction, testing & commissioning works. Of note, RWT has expanded into niche, high-growth sectors – tapping the potentials arising from non-traditional clients. These projects include upgrading works for the Industrial Effluent Treatment for MSM Sugar Refinery ( Johor) Sdn Bhd, Kerja-Kerja Pembinaan Sistem Rawatan Tangki Air (Tangki Enapan) serta Kerja- Kerja Berkaitan dengannya di Loji Rawatan Jeneri, Kedah Darul Aman for HHF Trading /SADA and STP Maintenance work along Senai-Desaru Expressway for ABNT Global. Project Description Client Contract Value (RM'Million) Timeline Contract to Supply, Deliver, Install Including Testing and Commissioning for Upgrading of Industrial Effluent Treatment Plant at MSM Sugar Refinery ( Johor) Sdn Bhd, Tanjung Langsat, Johor MSM Sugar Refinery ( Johor) Sdn Bhd 6.1 Start: 8 Jun 2022 End: 30 Jun 2023 Kerja-Kerja Pembinaan Sistem Rawatan Tangki Air (Tangki Enapan) serta Kerja-Kerja Berkaitan dengannya di Loji Rawatan Jeneri, Kedah Darul Aman HHF Trading/ Syarikat Air Darul Aman (SADA) 2.9 Start: 21 Jun 2022 End: 30 Jun 2023 RWT was also engaged by national sewerage company, Indah Water Konsortium (“IWK”), to undertake pilot plant studies for the Integrated Biological Fixed Film Clarification (“BFFC”) System at the Bukit Raja sewage treatment plant (“STP”) in Klang, Selangor. Another pilot study was also initiated with Ranhill SAJ for Excel Filter, Revocell and RevoPlus at the Endau and Sembrong WTPs. Technology Description Moving Forward Biological Fixed Film Clarification (BFFC) Pilot Project Integrated Biological Fixed-Film Clarification (BFFC) System is an idea of packaged plant which combines fixed-film attached growth biological treatment and lamella clarifier into one system. Will be the pioneer of fixed-film attached growth biological treatment and lamella clarifier listed as SPANregistered supplier in Municipal/Sewerage industry. SPAN approval has been obtained to start on pilot plant study at the Bukit Raja STP in Klang. Target start date: March 2023 with 6-month timeline. These pilot studies are essential in developing baselines that will facilitate the design and implementation of larger scale efficacy for WTPs and to obtain SPAN’s product registration under Category B. The pilot studies also position RWT as a pioneer and innovative solutions provider to the industry regulator and within the industry, capable of developing new and improved solutions that benefit the domestic water sector. From an operational perspective, RWT operations was completed 2nd Surveillance Audit to the ISO 9001:2015 Quality Management System while its Thai operations continued to maintain its ISO 9001:2015 status. As for other standards, namely the ISO 45001 Occupational Health and Safety Management and the ISO 14001 Environmental Management System, RWT’s Malaysia operations have completed Stage 1 of the certification process with the final stage expected to be completed by FY2023. RWT’s installed pollutant removal system (“PRS”) at Simpang Renggam WTP continues to ensure that ammonia levels in river water remain below the 10 parts per million (“ppm”) threshold. This has been instrumental in reducing the number of unplanned WTP shutdowns due to pollution. MANAGEMENT DI SCUSS ION & ANALYS I S

RkJQdWJsaXNoZXIy ODQxNzg=