Ranhill Utilities Berhad - AR2022

71 Sustainabi l i ty Sect ion 03 Annual Report 2022 SUSTA INAB I L I TY STATEMENT FY2022’s data for energy, emissions and water consumption as well as waste management have been scoped to the following: Examining the cooling system for the high pressure pump in the heat recovery steam generator at Rugading Power Station, Sabah Filter tank maintenance works at Sultan Iskandar Water Treatment Plant Gilkes Micro Hydro installed at Gunung Ledang WTP (100kW) Operating Companies Specific Operational Sites Ranhill SAJ All WTPs, reservoirs, dams and headquarters RWS Office RWT All wastewater treatment and reclaimed water plants RPI & RPII Teluk Salut and Rugading power plants RBSB Office RW Office PROMOTING CLEANER ENERGY PRODUCTION Ranhill is developing its first 50MW solar farm at Bidor, Perak. The Group, through the Corporate Green Power Programme (“CGPP”) also aims to develop 29.9 MW solar farms to supply clean energy to Ranhill SAJ. At Ranhill SAJ’s Sultan Iskandar WTP, solar panels provide 63 kWp of clean energy while at the Gunung Ledang WTP, the mini hydro installation generates 73 kWp of clean energy.

RkJQdWJsaXNoZXIy ODQxNzg=